Державна комісія з експертизи геологічних проектів та кошторисів ДГП "Геолекспертиза"

+38 (044) 285-66-18, 286-43-39
м. Київ 01133
вул. Кутузова, 18/7, оф. 906

ГОЛОВНА / Monitoring and scientific maintenance of subsoil use

The grounds for providing service of monitoring and scientific maintenance of subsoil use (M&SM):

SGE “Heolekspertyza” recognized winner of specialized state geological enterprises that conduct monitoring and scientific support subsoil.

 

SGE “Heolekspertyza” provides services of monitoring and scientific maintenance of subsoil use under the Provisions of providing of monitoring and scientific maintenance of subsoil use, adopted by Order of Ministry of ecology and mineral recourses 11.03.2013 № 96 registered with The Ministry of Justice of Ukraine 27.03.2013 № 500/23032.

 

Due to the more than 30 years of the geological works experience in the different directions SGE “Heolekspertyza” has the biggest, fullest geological normative base in Ukraine. According to the letter of State Service of Geology and Mineral Resources of Ukraine № 17340/01/04-13 from 31.12.13 for the second time our enterprise was pronounced a winner from specialized state geological enterprises, establishments and organizations controlled by State Service of Geology and Mineral Resources of Ukraine, which will provide the monitoring and scientific maintenance of subsoil use during the year.

 

Monitoring of subsoil use is accomplished for implementation of the special conditions of subsoil use, provided by a special permit and agreement about conditions of subsoil use of such types of commercial minerals: fossil fuels, metallic minerals, non-metals, fossil groundwater, therapeutic muds, inert gases.

Required list of documents for providing of monitoring and scientific maintenance of subsoil use (the copies of documents are allowed to be send by e-mail)

solid minerals:

  1. The minutes of confirmation (approbation) of geological reserves.
  2. The project of environment impact assessment.
  3. Plan for the development of mining work for the current year with the copy of plan of mining workings (certified by subsoil users seal)
  4. Approval documents of agency of State administration: ecological map, radiation certificate, certificate of radiation grade of raw materials and final products, license for special water use, risky job, pollution emission, waste dumping etc.
  5. Report documents for the last two years (form 5).
  6. Certificate of mine field, certificates of blocks.
  7. Graphical appendix (surface plan, geological set map and sections and reserves map).
  8. For solid commercial minerals in a case of execution of working exploration is required to provide a certificate about planned number of wells
  9. Agreement about providing the special permit for subsoil use (Ministry of natural environment protection and nuclear safety, State Health and Safety Supervision Authority, local authority etc.)
  10. Acts and diagram of mining and land permit.
  11. Acts and orders of scheduled inspections by the controlling authority for the previous and current years including resolutions and minutes about inspection finding (if enterprises were not inspected from previous and current year, it is required to provide a verification letter about their absence).
  12. Order Completion Report with acts of elimination the breaches.

groundwater:

  1. The minutes of geological reserves confirmation (approbation) (including the short authorial certificate, expert conclusions, examiner’s remarks, comment responses).
  2. Report about geology reserves/geology survey (where possible by email).
  3. Technological plan of water intake area (where possible, binding on mineral water).
  4. Enterprise development plan, water extraction
    (for the current year).
  5. Approval documents of general governments – Ecological map, certificates of radiation quality of water and the final products, permit for special water use, having waste water injection.
  6. Report document for the last two years (form 7)
  7. Certificates of wells, certificate of water intake area.
  8. Graphical appendix (surface plan, hydrogeological map with sections of scale 1:10000 — 1:25000). Coordination of the wells.
  9. Reserves map of underground water.
  10. The copies must be send by e-mail and in paper form ( binding on certified by subsoil users seal):
  11. Coordination of providing of special permit (Ministry of natural environment protection and nuclear safety, State Health and Safety Supervision Authority, local authority etc.)
  12. Official act as the permanent use of plot of the land (or rent).
  13. Acts and orders of scheduled inspections by the monitoring authorities for the previous and current years including resolutions and minutes about inspection finding (if enterprises were not inspected from previous and current year, it is required to provide a verification letter about the absence).
  14. Order Completion Report with acts of elimination the breaches.
  15. Size of Sanitary protection zone is ratified by local authority.